Alpha Global Projects Pvt. Ltd. successfully completed the execution of a complex project cargo shipment involving a heavy marine engine movement from Mumbai to Madagascar.
Cargo Specifications
- Dimensions: 755 x 275 x 390 CMS
• Weight: 69.5 Metric Tons
Key Operational Challenge
The major challenge during this shipment was that the old marine engine did not have proper lashing or securing points for safe transportation and handling on a Mafi trailer.
This created a critical operational concern during:
• Cargo securing
• Terminal handling
• Mafi transportation
• Vessel loading operations
Alpha Global Projects’ Engineered Solution
After detailed technical evaluation, our operations team developed a customized securing arrangement specifically designed for the cargo structure.
The scope included:
- Identification of safe structural reinforcement areas
- Fabrication and welding of additional lashing points without damaging the engine
- Customized lashing and securing arrangement
- Complete pre-loading stability and securing tests before final movement
The successful testing validated cargo stability and ensured safe handling throughout the operation.
Execution Highlights
- Smooth loading onto Mafi trailer
• Safe terminal and vessel handling
• Zero cargo damage
• Zero operational incidents
• Successful execution from origin to vessel loading stage
This project highlights Alpha Global Projects’ expertise in project freight forwarding and engineered logistics solutions for complex heavy-lift and oversized cargo movements.





